TransPAC2 Network Operations Report
03/28/2011 - 04/03/2011

TransPAC2 Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)


None during this report period

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

1157 3-Elevated 1-Critical TransPAC Core Node LOSA Maintenance Completed Hardware 03/29/2011 5:31 PM 03/29/2011 8:36 PM

Scheduled Maintenances Detail

Ticket No.:1157:62
Subject:TransPAC Core Node LOSA Maintenance Completed
Affected:Core Node LOSA and all connections
Start Time:Tuesday, March 29, 2011, 5:31 PM (1731) UTC
End Time:Tuesday, March 29, 2011, 8:36 PM (2036) UTC
Description: TransPAC Network Engineers replaced the TransPAC router in Los Angeles, CA. All connections to the Core Node have been restored. The maintenance is now complete.


Downtime and Availability



TransPAC2 Core NodesDown TimeReporting Period Availability52 Week Availability
TransPAC2 T320 - LA3 hr 5 min98.16468%99.95238%
6410 Ethernet Switch0 hr 0 min100.00000%100.00000%
3410 Ethernet Switch0 hr 0 min100.00000%100.00000%
OOB Router0 hr 0 min100.00000%100.00000%

Aggregate TransPAC2 Core Nodes3 hr 5 min99.54117%99.98810%

TransPAC2 Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
TransPAC2 LOSA-JGN2 LOSA 10GigE0 hr 0 min100.00000%99.99829%
TransPAC2 LOSA-Pacific Wave LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC2 TOKY-TransPAC2 LOSA0 hr 0 min100.00000%99.55620%

Aggregate All TransPAC2 Backbone Circuits0 hr 0 min100.00000%99.85150%





Upcoming Scheduled Maintenances