TransPAC Network Operations Report
10/17/2011 - 10/23/2011

TransPAC Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)


None during this report period

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

None during this report period

Downtime and Availability



TransPAC Core NodesDown TimeReporting Period Availability52 Week Availability
TransPAC MX480 - LA0 hr 0 min100.00000%99.96490%
6410 Ethernet Switch0 hr 0 min100.00000%100.00000%
3410 Ethernet Switch0 hr 0 min100.00000%100.00000%
OOB Router0 hr 0 min100.00000%100.00000%

Aggregate TransPAC Core Nodes0 hr 0 min100.00000%99.99123%

TransPAC Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
TransPAC LOSA-JGN2 LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC LOSA-Pacific Wave LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC TOKY-TransPAC2 LOSA0 hr 0 min100.00000%98.09901%

Aggregate All TransPAC Backbone Circuits0 hr 0 min100.00000%99.36634%





Upcoming Scheduled Maintenances

Ticket No.:1197:62
Subject:TransPAC TOKY-TransPAC LOSA Backbone Circuit Maintenance
Affected:TransPAC TOKY-TransPAC LOSA Backbone Circuit
Start Time:Sunday, November 13, 2011, 3:00 PM (1500) UTC
End Time:Sunday, November 13, 2011, 7:00 PM (1900) UTC
Description: The TransPAC TOKY-TransPAC LOSA Backbone Circuit will be unavailable while KDDI engineers perform maintenance in Los Angeles, CA. Traffic will re-route via the JGN circuit during the maintenance, however the entire window has been reserved.