TransPAC2 Network Operations Report
03/15/2010 - 03/21/2010

TransPAC2 Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services
Softbank-JGN in Los Angeles

Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)

10491-Critical 1-Critical TransPAC2 Core Node LOSA Outage Resolved Hardware 03/18/2010 2:33 AM 03/18/2010 6:08 AM

Unscheduled Outages Detail


Ticket No.:1049:62
Subject:TransPAC2 Core Node LOSA Outage Resolved
Affected:Core Node LOSA
Start Time:Thursday, March 18, 2010, 2:33 AM (0233) UTC
End Time:Thursday, March 18, 2010, 6:08 AM (0608) UTC
Description:Core Node LOSA is now available. TransPAC2 Engineering was contacted and performed a reboot on a TransPAC2 switch in Los Angeles. No further outages are expected.

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

None during this report period

Downtime and Availability



TransPAC2 Core NodesDown TimeReporting Period Availability52 Week Availability
TransPAC2 T320 - LA0 hr 0 min100.00000%99.99943%
6410 Ethernet Switch3 hr 35 min97.86706%99.95826%
3410 Ethernet Switch0 hr 0 min100.00000%100.00000%
OOB Router0 hr 0 min100.00000%100.00000%

Aggregate TransPAC2 Core Nodes3 hr 35 min99.46676%99.98942%

TransPAC2 Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
TransPAC2 LOSA-JGN2 LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC2 LOSA-Pacific Wave LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC2 TOKY-TransPAC2 LOSA0 hr 0 min100.00000%99.49416%

Aggregate All TransPAC2 Backbone Circuits0 hr 0 min100.00000%99.83139%