TransPAC Network Operations Report
2020-09-21 - 2020-09-27

TransPAC Network Operations Center

New Connections

ConnectorTypeDateSponsor


Upgrades

None


New Services


None


Other


None


Unscheduled Outages Summary

Incident Number Customer Impact Network Impact Title Outage Type Source of Impact Current State Start Time (UTC) End Time (UTC) Duration

INC0066044 4 - Low2 - High Availability - TransPAC Backbone HONG-GUAMUndetermined Vendor Resolved 2020-09-26 07:16:52
2020-09-28 00:00:00
2020-09-27 23:23:59
2020-09-28 16:28:36
1 days 16 hr 7 min
0 days 16 hr 28 min

Unscheduled Outages Detail


Ticket No.:INC0066044
Subject:Availability - TransPAC Backbone HONG-GUAM
Source Of Impact: Vendor
Affected:TP2-HONG-GUAM-10GE-01528
TP2-HONG-GUAM-10GE-01528
Backbone HONG-GUAM
Current State:Resolved
Start Time:2020-09-26 07:16:52
End Time:2020-09-27 23:23:59
DescriptionThe listed asset is currently not degraded. Vendor Engineers have been contacted, the reason for the intial degradation was an outage in China. Updates will be provided as they are received. Traffic was not impacted due to redundancy.


Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Source Of Impact Current State Start Time (UTC) End Time (UTC) Duration


Scheduled Maintenances Detail


None during this report period

Downtime and Availability



TransPAC NodesDown TimeReporting Period Availability52 Week Availability
oob.hong.transpac.org00 hr 00 min100.00000% 100.00000%
perf.hong.transpac.org00 hr 00 min100.00000% 100.00000%
rtr.cernet.transpac.org00 hr 00 min100.00000% 100.00000%
spare.ctc.transpac.org00 hr 00 min100.00000% 100.00000%
test.seat.transpac.org00 hr 00 min100.00000% 100.00000%
pw-sttl-100 hr 00 min100.00000% 100.00000%
rtr.toky.transpac.org00 hr 00 min100.00000% 100.00000%
rtr.hong.transpac.org00 hr 00 min100.00000% 100.00000%
rtr.seat.transpac.org00 hr 00 min100.00000% 100.00000%

Aggregate TransPAC Core Nodes0 days 0 hr 0 min 100.00000% 100.00000%

TransPAC Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
TP2-SEAT-TP-SEAT-TP-100GE-0152300 hr 00 min 100.00000% 99.98692%
TP2-HONG-HONG-VLAN-0153800 hr 00 min 100.00000% 100.00000%
TP2-HONG-GUAM-LAG-0153400 hr 00 min 100.00000% 100.00000%
TP2-SEAT-TP-TOKY-100GE-0152200 hr 00 min 100.00000% 99.96797%
TP2-HONG-HONG-VLAN-0154600 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0153600 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0154100 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0153200 hr 00 min 100.00000% 99.99581%
TP2-HONG-SEAT-TP-VLAN-0153100 hr 00 min 100.00000% 99.97803%
TP2-HONG-SEAT-TP-VLAN-0152900 hr 00 min 100.00000% 99.99937%
TP2-HONG-HONG-VLAN-0153000 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-10GE-0152600 hr 00 min 100.00000% 99.99897%
TP2-HONG-HONG-VLAN-0154300 hr 00 min 100.00000% 99.99937%
TP2-HONG-HONG-VLAN-0153700 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0154400 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-10GE-0152400 hr 00 min 100.00000% 99.99751%
TP2-HONG-HONG-VLAN-0153500 hr 00 min 100.00000% 100.00000%
TP2-HONG-SEAT-TP-VLAN-0153300 hr 00 min 100.00000% 100.00000%
TP2-HONG-GUAM-10GE-015283 days 8 hr 14 min 52.24000% 99.07718%
TP2-HONG-HONG-VLAN-0154200 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-10GE-0153900 hr 00 min 100.00000% 100.00000%
TP2-HONG-GUAM-10GE-0152700 hr 00 min 100.00000% 98.06257%
TP2-HONG-HONG-10GE-0152500 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0154000 hr 00 min 100.00000% 100.00000%
TP2-HONG-HONG-VLAN-0154500 hr 00 min 100.00000% 100.00000%

Aggregate All TransPAC Backbone Circuits3 days 8 hr 14 min 98.08960% 99.88255%

Availablity by Service

TransPAC Backbone CircuitsDown TimeReporting Period Availability52 Week Availability


Upcoming Scheduled Maintenances

Ticket No.:CHG0046029
Subject:Maintnenance - TransPAC Core GOREX to GNC Migration
Source Of Impact: Vendor
Affected:TP2-HONG-GUAM-10GE-01527
TP2-HONG-GUAM-10GE-01528
Start Time:2020-10-05 19:00:00
End Time:2020-10-06 23:59:59
DescriptionDuring the maintnenanvce window vendor engineers will power down the GOREX equipment, then transport to GNC and reassemble. The Gorex facility gear will be reloacated to GNC. All 10G circuits will be impacted during this window.